Hopp til høvuðsinnihald (Skip to main content)
Nordic Aqua Partners logo
  • Company
    • Our Company
    • Board and Management
    • Our Mission
    • Our Concept
    • Events
    • Our Location
    • Our Expansion Options
    • Our Local Partners
    • Our Industrial Partners
    • Job Openings
  • News
  • Technology
    • Sea Water
    • Filtration and Ultrafiltration
    • UV/Ozone Filtration
    • From Seawater to Freshwater
    • Mechanical- and biofilters
    • CO2 stripping
    • Oxygenation
    • Fish tank
    • Cleaning outlet used as fertilizers
    • Clean water back to the sea
  • Sustainability
    • Beyond air freight emissions
    • Full traceability
    • No use for scarce freshwaters
    • Zero wastewater farming
    • Powered by the wind and sun
    • Land use efficiency
    • Closer means faster to marked
  • Investor
    • Share Information
    • Notices
    • Reports and presentations
    • Corporate Governance
    • Analysts Coverage
    • Financial Calendar
    • Investor Contact
  • Contact
  1. 13.03.2023
    1 / 71
    Overview
    Go to last slide Go to next slide
  2. 13.03.2023
    2 / 71
    Overview
    Go to previous slide Go to next slide
  3. 30.01.2023
    3 / 71
    Main entrance to the facility. Small building with Hatchery, RAS 1, 2 and 3 together with administration
    Go to previous slide Go to next slide
  4. 30.01.2023
    4 / 71
    RAS4 almost ready for fish introduction
    Go to previous slide Go to next slide
  5. 30.01.2023
    5 / 71
    RAS 4 Drain and fish logistics pipe
    Go to previous slide Go to next slide
  6. 30.01.2023
    6 / 71
    AKVA Group finalising electrical installation
    Go to previous slide Go to next slide
  7. 25.01.2023
    7 / 71
    Overview
    Go to previous slide Go to next slide
  8. 12.01.2023
    8 / 71
    RAS 3 Water cleaning
    Go to previous slide Go to next slide
  9. 06.12.2022
    9 / 71
    Overview
    Go to previous slide Go to next slide
  10. 13.10.2022
    10 / 71
    RAS 03
    Go to previous slide Go to next slide
  11. 13.10.2022
    11 / 71
    Overview
    Go to previous slide Go to next slide
  12. 28.09.2022
    12 / 71
    RAS 03
    Go to previous slide Go to next slide
  13. 09.09.2022
    13 / 71
    Batch no 3 from Benchmark Genetics
    Go to previous slide Go to next slide
  14. 09.09.2022
    14 / 71
    Bergur inspecting frys
    Go to previous slide Go to next slide
  15. 06.09.2022
    15 / 71
    Overview
    Go to previous slide Go to next slide
  16. 06.09.2022
    16 / 71
    RAS 04 and 05 taking shape
    Go to previous slide Go to next slide
  17. 28.07.2022
    17 / 71
    Overview
    Go to previous slide Go to next slide
  18. 14.07.2022
    18 / 71
    Overview
    Go to previous slide Go to next slide
  19. 27.06.2022
    19 / 71
    RAS 4 filter unit concrete construction errection
    Go to previous slide Go to next slide
  20. 20.06.2022
    20 / 71
    Ras 4 foundation for biofilter
    Go to previous slide Go to next slide
  21. 10.06.2022
    21 / 71
    Second Inlay of eggs successfully completed
    Go to previous slide Go to next slide
  22. 10.06.2022
    22 / 71
    Second Inlay of eggs successfully completed
    Go to previous slide Go to next slide
  23. 10.06.2022
    23 / 71
    Second Inlay of eggs successfully completed
    Go to previous slide Go to next slide
  24. 17.05.2022
    24 / 71
    Farm Manager, Ola transferring the first fish to start feeding
    Go to previous slide Go to next slide
  25. 17.05.2022
    25 / 71
    Start feeding in RAS 1
    Go to previous slide Go to next slide
  26. 27.04.2022
    26 / 71
    Xiaoxiao inspecting the yolk-sac fry
    Go to previous slide Go to next slide
  27. 27.04.2022
    27 / 71
    Construction meeting at Gaotang Island
    Go to previous slide Go to next slide
  28. 26.04.2022
    28 / 71
    Overview
    Go to previous slide Go to next slide
  29. 06.04.2022
    29 / 71
    Overview
    Go to previous slide Go to next slide
  30. 29.03.2022
    30 / 71
    Overview
    Go to previous slide Go to next slide
  31. 25.03.2022
    31 / 71
    First hatching of eggs
    Go to previous slide Go to next slide
  32. 15.03.2022
    32 / 71
    Xiaoxiao taking care of our precious eggs
    Go to previous slide Go to next slide
  33. 09.03.2022
    33 / 71
    Ola Frøvik pleased to receive our precious eggs
    Go to previous slide Go to next slide
  34. 03.03.2022
    34 / 71
    Overview
    Go to previous slide Go to next slide
  35. 21.01.2022
    35 / 71
    Hatchery
    Go to previous slide Go to next slide
  36. 20.01.2022
    36 / 71
    Main Entry construction
    Go to previous slide Go to next slide
  37. 20.01.2022
    37 / 71
    Overview
    Go to previous slide Go to next slide
  38. 20.01.2022
    38 / 71
    Construction RAS 1
    Go to previous slide Go to next slide
  39. 04.01.2022
    39 / 71
    Overview
    Go to previous slide Go to next slide
  40. 31.12.2021
    40 / 71
    Hatchery
    Go to previous slide Go to next slide
  41. 22.12.2021
    41 / 71
    Hatchery equipment beeing installed
    Go to previous slide Go to next slide
  42. 14.12.2021
    42 / 71
    2021.12.14
    Go to previous slide Go to next slide
  43. 07.12.2021
    43 / 71
    Screenshot 2021 12 08 154824
    Go to previous slide Go to next slide
  44. 07.12.2021
    44 / 71
    2021.12.07
    Go to previous slide Go to next slide
  45. 29.11.2021
    45 / 71
    Foundation on-growing building
    Go to previous slide Go to next slide
  46. 08.11.2021
    46 / 71
    1108 1
    Go to previous slide Go to next slide
  47. 08.11.2021
    47 / 71
    1108
    Go to previous slide Go to next slide
  48. 02.11.2021
    48 / 71
    1102
    Go to previous slide Go to next slide
  49. 26.10.2021
    49 / 71
    1026
    Go to previous slide Go to next slide
  50. 25.10.2021
    50 / 71
    1025
    Go to previous slide Go to next slide
  51. 25.10.2021
    51 / 71
    1025 1
    Go to previous slide Go to next slide
  52. 18.10.2021
    52 / 71
    1018
    Go to previous slide Go to next slide
  53. 18.10.2021
    53 / 71
    1018 1
    Go to previous slide Go to next slide
  54. 09.10.2021
    54 / 71
    1009
    Go to previous slide Go to next slide
  55. 05.10.2021
    55 / 71
    1005
    Go to previous slide Go to next slide
  56. 05.10.2021
    56 / 71
    1005 1
    Go to previous slide Go to next slide
  57. 24.09.2021
    57 / 71
    0924
    Go to previous slide Go to next slide
  58. 24.09.2021
    58 / 71
    0924 1
    Go to previous slide Go to next slide
  59. 17.09.2021
    59 / 71
    0917
    Go to previous slide Go to next slide
  60. 09.09.2021
    60 / 71
    0906
    Go to previous slide Go to next slide
  61. 02.09.2021
    61 / 71
    0902
    Go to previous slide Go to next slide
  62. 02.08.2021
    62 / 71
    0802
    Go to previous slide Go to next slide
  63. 05.07.2021
    63 / 71
    0705
    Go to previous slide Go to next slide
  64. 26.05.2021
    64 / 71
    0526
    Go to previous slide Go to next slide
  65. 07.05.2021
    65 / 71
    0705 1
    Go to previous slide Go to next slide
  66. 06.05.2021
    66 / 71
    0506
    Go to previous slide Go to next slide
  67. 26.04.2021
    67 / 71
    0426
    Go to previous slide Go to next slide
  68. 25.03.2021
    68 / 71
    0325
    Go to previous slide Go to next slide
  69. 17.03.2021
    69 / 71
    0317
    Go to previous slide Go to next slide
  70. 10.03.2021
    70 / 71
    Alternative Text
    Go to previous slide Go to next slide
  71. 10.03.2021
    71 / 71
    Land filling
    Go to previous slide Go to first slide
  1. Go to slide 1
  2. Go to slide 2
  3. Go to slide 3
  4. Go to slide 4
  5. Go to slide 5
  6. Go to slide 6
  7. Go to slide 7
  8. Go to slide 8
  9. Go to slide 9
  10. Go to slide 10
  11. Go to slide 11
  12. Go to slide 12
  13. Go to slide 13
  14. Go to slide 14
  15. Go to slide 15
  16. Go to slide 16
  17. Go to slide 17
  18. Go to slide 18
  19. Go to slide 19
  20. Go to slide 20
  21. Go to slide 21
  22. Go to slide 22
  23. Go to slide 23
  24. Go to slide 24
  25. Go to slide 25
  26. Go to slide 26
  27. Go to slide 27
  28. Go to slide 28
  29. Go to slide 29
  30. Go to slide 30
  31. Go to slide 31
  32. Go to slide 32
  33. Go to slide 33
  34. Go to slide 34
  35. Go to slide 35
  36. Go to slide 36
  37. Go to slide 37
  38. Go to slide 38
  39. Go to slide 39
  40. Go to slide 40
  41. Go to slide 41
  42. Go to slide 42
  43. Go to slide 43
  44. Go to slide 44
  45. Go to slide 45
  46. Go to slide 46
  47. Go to slide 47
  48. Go to slide 48
  49. Go to slide 49
  50. Go to slide 50
  51. Go to slide 51
  52. Go to slide 52
  53. Go to slide 53
  54. Go to slide 54
  55. Go to slide 55
  56. Go to slide 56
  57. Go to slide 57
  58. Go to slide 58
  59. Go to slide 59
  60. Go to slide 60
  61. Go to slide 61
  62. Go to slide 62
  63. Go to slide 63
  64. Go to slide 64
  65. Go to slide 65
  66. Go to slide 66
  67. Go to slide 67
  68. Go to slide 68
  69. Go to slide 69
  70. Go to slide 70
  71. Go to slide 71

Progress Images

Follow our progess in Gaotang, China

Overview
Overview
13.03.2023
Overview
Overview
13.03.2023
Main entrance to the facility. Small building with Hatchery, RAS 1, 2 and 3 together with administration
Main entrance to the facility. Small building with Hatchery, RAS 1, 2 and 3 together with administration
30.01.2023
RAS4 almost ready for fish introduction
RAS4 almost ready for fish introduction
30.01.2023
RAS 4 Drain and fish logistics pipe
RAS 4 Drain and fish logistics pipe
30.01.2023
AKVA Group finalising electrical installation
AKVA Group finalising electrical installation
30.01.2023
Overview
Overview
25.01.2023
RAS 3 Water cleaning
RAS 3 Water cleaning
12.01.2023
Overview
Overview
06.12.2022
RAS 03
RAS 03
13.10.2022
Overview
Overview
13.10.2022
RAS 03
RAS 03
28.09.2022
Batch no 3 from Benchmark Genetics
Batch no 3 from Benchmark Genetics
09.09.2022
Bergur inspecting frys
Bergur inspecting frys
09.09.2022
Overview
Overview
06.09.2022
RAS 04 and 05 taking shape
RAS 04 and 05 taking shape
06.09.2022
Overview
Overview
28.07.2022
Overview
Overview
14.07.2022
RAS 4 filter unit concrete construction errection
RAS 4 filter unit concrete construction errection
27.06.2022
Ras 4 foundation for biofilter
Ras 4 foundation for biofilter
20.06.2022
Second Inlay of eggs successfully completed
Second Inlay of eggs successfully completed
10.06.2022
Second Inlay of eggs successfully completed
Second Inlay of eggs successfully completed
10.06.2022
Second Inlay of eggs successfully completed
Second Inlay of eggs successfully completed
10.06.2022
Farm Manager, Ola transferring the first fish to start feeding
Farm Manager, Ola transferring the first fish to start feeding
17.05.2022
Start feeding in RAS 1
Start feeding in RAS 1
17.05.2022
Xiaoxiao inspecting the yolk-sac fry
Xiaoxiao inspecting the yolk-sac fry
27.04.2022
Construction meeting at Gaotang Island
Construction meeting at Gaotang Island
27.04.2022
Overview
Overview
26.04.2022
Overview
Overview
06.04.2022
Overview
Overview
29.03.2022
First hatching of eggs
First hatching of eggs
25.03.2022
Xiaoxiao taking care of our precious eggs
Xiaoxiao taking care of our precious eggs
15.03.2022
Ola Frøvik pleased to receive our precious eggs
Ola Frøvik pleased to receive our precious eggs
09.03.2022
Overview
Overview
03.03.2022
Hatchery
Hatchery
21.01.2022
Main Entry construction
Main Entry construction
20.01.2022
Overview
Overview
20.01.2022
Construction RAS 1
Construction RAS 1
20.01.2022
Overview
Overview
04.01.2022
Hatchery
Hatchery
31.12.2021
Hatchery equipment beeing installed
Hatchery equipment beeing installed
22.12.2021
2021.12.14

14.12.2021
Screenshot 2021 12 08 154824

07.12.2021
2021.12.07

07.12.2021
Foundation on-growing building
Foundation on-growing building
29.11.2021
1108 1

08.11.2021
1108

08.11.2021
1102

02.11.2021
1026

26.10.2021
1025

25.10.2021
1025 1

25.10.2021
1018

18.10.2021
1018 1

18.10.2021
1009

09.10.2021
1005

05.10.2021
1005 1

05.10.2021
0924

24.09.2021
0924 1

24.09.2021
0917

17.09.2021
0906

09.09.2021
0902

02.09.2021
0802

02.08.2021
0705

05.07.2021
0526

26.05.2021
0705 1

07.05.2021
0506

06.05.2021
0426

26.04.2021
0325

25.03.2021
0317

17.03.2021
Alternative Text
Alternative Text
10.03.2021
Land filling
Land filling
10.03.2021

Nordic Aqua Partners A/S

HundeGade 1,
6760 Ribe,
Denmark

Business Registration No.
38 18 30 01

Nordic Aqua (Ningbo) Co., Ltd.

Legal address:
Kengtou Hill, Zhumen Village, Gaotang Island, Xiangshan, Ningbo, China
Site address:
Huangwantang, Gaotang Island, Xiangshan, Ningbo China
Office in Ningbo:
A3-301, 89 Jinchuan Road, Nordic Industrial Park, Zhenhai, Ningbo, China
  1. Company
  2. News
  3. Technology
  4. Sustainability
  5. Investor
  6. Contact
  7. Job Openings
  8. Privacy Policy
  9. Cookie Policy
  10. Legal Notice

Subscribe to newsletter

Copyright 2020 - 2023 Nordic Aqua Partners A/S Rights Reserved Ment, forritað og sniðgivið hava Sansir