Progress ImagesFollow our progess in Gaotang, China 13.08.2024 13.08.2024 13.08.2024 18.06.2024 10.06.2024 10.06.2024 19.04.2024 19.04.2024 19.04.2024 08.03.2024Overview 29.11.2023Overview 29.11.2023RAS 07 15.11.2023Overview 08.10.2023Overview 08.10.2023Overview 28.06.2023Overview 02.05.2023Office almost ready to move in 20.04.2023Office almost ready to move in 20.04.2023Entrance area 20.04.2023Office almost ready to move in 20.04.2023Entrance area 20.04.2023Xiaoxiao and Seashore taking good care of our small fish 24.03.2023Overview 13.03.2023Overview 13.03.2023Main entrance to the facility. Small building with Hatchery, RAS 1, 2 and 3 together with administration 30.01.2023RAS4 almost ready for fish introduction 30.01.2023RAS 4 Drain and fish logistics pipe 30.01.2023AKVA Group finalising electrical installation 30.01.2023Overview 25.01.2023RAS 3 Water cleaning 12.01.2023Overview 06.12.2022RAS 03 13.10.2022Overview 13.10.2022RAS 03 28.09.2022Batch no 3 from Benchmark Genetics 09.09.2022Bergur inspecting frys 09.09.2022Overview 06.09.2022RAS 04 and 05 taking shape 06.09.2022Overview 28.07.2022Overview 14.07.2022RAS 4 filter unit concrete construction errection 27.06.2022Ras 4 foundation for biofilter 20.06.2022Second Inlay of eggs successfully completed 10.06.2022Second Inlay of eggs successfully completed 10.06.2022Second Inlay of eggs successfully completed 10.06.2022Farm Manager, Ola transferring the first fish to start feeding 17.05.2022Start feeding in RAS 1 17.05.2022Xiaoxiao inspecting the yolk-sac fry 27.04.2022Construction meeting at Gaotang Island 27.04.2022Overview 26.04.2022Overview 06.04.2022Overview 29.03.2022First hatching of eggs 25.03.2022Xiaoxiao taking care of our precious eggs 15.03.2022Ola Frøvik pleased to receive our precious eggs 09.03.2022Overview 03.03.2022Hatchery 21.01.2022Main Entry construction 20.01.2022Overview 20.01.2022Construction RAS 1 20.01.2022Overview 04.01.2022Hatchery 31.12.2021Hatchery equipment beeing installed 22.12.2021 14.12.2021 07.12.2021 07.12.2021Foundation on-growing building 29.11.2021 08.11.2021 08.11.2021 02.11.2021 26.10.2021 25.10.2021 25.10.2021 18.10.2021 18.10.2021 09.10.2021 05.10.2021 05.10.2021 24.09.2021 24.09.2021 17.09.2021 09.09.2021 02.09.2021 02.08.2021 05.07.2021 26.05.2021 07.05.2021 06.05.2021 26.04.2021 25.03.2021 17.03.2021 10.03.2021Land filling 10.03.2021